 <a id="main-content" tabindex="-1"></a>     Sub-navigation   Navigation links - Current: Sub-navigation     

- [ Jorvi Hospital construction projects ](/en/about-us/strategy-and-responsibility/hospitals-future/jorvi-hospital-construction-projects)
- [ Laakso Joint Hospital ](/en/about-us/strategy-and-responsibility/hospitals-future/laakso-joint-hospital)
- [ Peijas construction projects ](/en/about-us/strategy-and-responsibility/hospitals-future/peijas-construction-projects)
- [ Renovation of Women’s Hospital ](/en/about-us/strategy-and-responsibility/hospitals-future/renovation-womens-hospital)
- [ Renovation of the Comprehensive Cancer Center ](/en/about-us/strategy-and-responsibility/hospitals-future/renovation-comprehensive-cancer-center)
- [ Salvia building ](/en/about-us/strategy-and-responsibility/hospitals-future/salvia-building)
 


 



 

- [ Jorvi Hospital construction projects ](/en/about-us/strategy-and-responsibility/hospitals-future/jorvi-hospital-construction-projects)
- [ Laakso Joint Hospital ](/en/about-us/strategy-and-responsibility/hospitals-future/laakso-joint-hospital)
- [ Peijas construction projects ](/en/about-us/strategy-and-responsibility/hospitals-future/peijas-construction-projects)
- [ Renovation of Women’s Hospital ](/en/about-us/strategy-and-responsibility/hospitals-future/renovation-womens-hospital)
- [ Renovation of the Comprehensive Cancer Center ](/en/about-us/strategy-and-responsibility/hospitals-future/renovation-comprehensive-cancer-center)
- [ Salvia building ](/en/about-us/strategy-and-responsibility/hospitals-future/salvia-building)
 


 

 

  #  Renovation of the Comprehensive Cancer Center 

We are renovating the low-rise building section of the Comprehensive Cancer Center in phases during 2020–2025.

 

  ![Syöpätautien klinikka](/sites/default/files/styles/main_content_small/public/2020-09/syopatautien-klinikan-perskorjaus-paakuva-lev-1600.jpg?itok=zS5skEx8) 

 

 After the renovation, the mechanical, electrical, and plumbing systems in the low-rise building section of the Comprehensive Cancer Center will meet the needs of modern specialized healthcare. The renovation will take into account the previously renovated facilities and the significant investments made in the premises.

The first phase of the renovation, which covered floors 0 and 1 at the southern end of the low-rise building section, was completed in 2022. Floors 1–2 of the northern end of the low-rise building section will be renovated during the second phase.

## **Treatment of cancer in Meilahti**

At the Meilahti campus, we treat cancer patients in three hospitals: Triangle Hospital, Bridge Hospital, and in the lower floors of the older, renovated section of the Comprehensive Cancer Center.

The low-rise building section of the Comprehensive Cancer Center houses the radiation therapy and molecular radiotherapy units (formerly the Nuclear Medicine Unit), <a>as well as medical imaging and the Palliative Care Center. </a>[\[PM1\]](#_msocom_1)

**INFORMATION ON THE RENOVATION**

- Comprehensive Cancer Center’s year of construction: 1962
- Location: Helsinki, Meilahti
- Owner: HUS
- Renovation developer: [HUS Real Estate Ltd](https://www.huskiinteistot.fi/)

**Phase 2**

- Implementation planning will be completed in early 2024
- Estimated renovation time: 2023–2025
- Lead designer: Arkkitehtitoimisto Tähti-Set Oy
- Size: 3,155 brm²
- Cost estimate: MEUR 12.2
- Estimated renovation time: 2023–2025

 



 

  

 

 ##  Further information on this topic 

###  [ Hospitals of the future ](/en/about-us/strategy-and-responsibility/hospitals-future) 

In HUS’s construction projects, we are proceeding in accordance with our long-term renovation and construction program for hospital buildings.

 

 

  

 

 

 

 

 

##  Specialists 

###  [ Salla Itäaho ](/en/person/salla-itaaho) 

 Architect 

Real Estate and Facilities

 

 

  



###  [ Olli Siira ](/en/person/olli-siira) 

 Project Manager 

HUS Kiinteistöt Oy

 

 

  



 

 

 

 

 Updated: 15.04.2025

   Print this page